Показаны сообщения с ярлыком maintenance management. Показать все сообщения
Показаны сообщения с ярлыком maintenance management. Показать все сообщения

понедельник, 27 июля 2026 г.

8 Elements Approach – Planned Maintenance Structure

 


Total Productive Maintenance (TPM), a system where workers and operators help clean, check, and fix their own machines to stop breakdowns before they happen. It focuses on team-based upkeep, safety, and making daily work run smoothly.
Key Parts of Total Productive Maintenance
  • Autonomous Maintenance: Operators do simple daily tasks like dusting, oiling, and looking for loose parts on their own tools.
  • Planned Maintenance: Technicians use a calendar to fix or swap parts based on how machines wear down over time.
  • Focused Improvement: Small groups work together to solve hard, repeat machine problems using step-by-step ideas. 
Main Goals
  • Zero Breakdowns: Keep machines running without sudden stops.
  • Zero Defects: Stop bad products from being made due to tool errors.
  • Zero Accidents: Make the workspace safe for everyone. 


TPM activity in which the specialized maintenance department shifts the maintenance focus:

  • from breakdown maintenance (BM) to preventive maintenance (PM);
  • from corrective maintenance (CM) and time-based maintenance (TBM) to predictive maintenance (PdM) or condition-based maintenance (CBM);
  • while reducing maintenance costs and supporting the Autonomous Maintenance program.



Four phases approach for Zero Breakdown


  • Phase 1. Reduction in the irregularity of failure frequency
    • Restoration of deterioration left unattended for a long period to the original state
      • Handling the latent defects
    • Elimination of forced deterioration
      • Establish basic conditions
      • Defining and keeping with operating conditions
  • Phase 2. Extension product life expectancy
    • Improving weak points in the design
      • Improving weakness in strength and accuracy
      • Selecting the components meeting the requirements
      • Improving weakness for excessive loading
    • Elimination of incidental failures
      • Improving operation and maintenance skills
      • Countermeasures to prevent improper operation
      • Countermeasures to prevent improper repair
    • Restoration of external deterioration
  • Phase 3. Time-based restoration of deteriorated portion to the original state
    • Time-based restoration of deterioration
      • Prediction of service life
      • Time-based inspection and testing standards
      • Time-based replacement criteria
      • Improvement of maintainability
    • Detection of the sign of abnormality inside the equipment through senses
      • One which shows a sign and one which does not show any sign
      • What kind of sign can be seen before the abnormality occurs?
      • How can we detect the sign?
  • Phase 4. Prediction of service life
    • Prediction of service life through equipment diagnosis technique. Technological analysis of catastrophic failure
      • Analysis of fracture Plane
      • Analysis of material fatigue
      • Analysis of gear teeth etc.
      • Countermeasure to retain a longer service life
      • From the prediction of service life to the time-based restoration of deterioration


Equipment Model & Parts Model


7 step activities for Planned Maintenance and Autonomous Maintenance


PM 8 Elements. 7 – Step Deployment. Part 1


Part 2


Part 3


Part 4




https://tinyurl.com/2hkjxx63